Current Consulting Projects (2025–2027)

Currently leading the following international projects as Senior Consultant at MRC Consultants & Transaction Advisers, Seureca Veolia.


1. Kenya Solar PV Feasibility Study – Seven Forks Extension (100 MW)

Client: KenGen (Kenya Electricity Generating Company) Period: May 2026 – April 2027 Location: Kenya

Leading feasibility study for a 100 MW solar PV extension near the existing Seven Forks complex. Key activities include:


2. Pakistan AMI Meters – Technical Consultant (16.2 Million Meters, 5 DISCOs)

Client: IFC / World Bank | PPIB – LESCO, MEPCO, PESCO, QESCO, HAZECO Period: May 2026 – March 2027 Location: Pakistan

Leading IFC/World Bank advisory for AMI rollout across five Pakistani distribution companies under a Build, Finance, Operate and Transfer (BFOT) concession model. Key activities include:


3. Kenya Power System Loss Reduction Study

Client: Kenya Power and Lighting Company (KPLC), World Bank Period: 2024 – 2025 Location: Kenya

Leading comprehensive study targeting reduction of distribution losses from 23% to 18% by FY2028:


4. Tajikistan Energy Loss Reduction Project (Task 10)

Client: STB Tajikistan, World Bank Period: 2023 – 2025 Location: Tajikistan

Leading distribution network analysis for overloaded MV/LV transformer identification and network optimization:


Past Research & Academic Projects (2020–2024)

The following projects were conducted during tenure as Associate Professor and Director of the Sino-Pak Center for Artificial Intelligence at Pak-Austria Fachhochschule (2020–2024).

Federated Learning for Power System Optimization Using federated learning to exchange flexibility in the power grid while maintaining privacy of individual models.

Decentralized AI on Edge IoT for Illegal Wood Cutting Detection Tiny ML-based audio detection system deployed on low-power microcontrollers communicating over LoRa WAN to identify illegal wood cutting activity in forests.

HVAC Predictive Maintenance Collaboration with National Centre for Physics, Pakistan, to model air processor faults and implement predictive maintenance algorithms using sensor data.

MLOps Platform Engineering Deployed MLOps platform on Kubernetes cluster providing end-to-end development solutions (1,200 GPU cores, 3.7 TiB RAM, 600 GB GPU RAM).

Proxmox-Based Hypervisor for HPC Deployed HPC platform with 2,352 CPUs, 5.37 TiB RAM, 700 TiB disk space for data lake applications.